method-statement.ru - robtex.com
method-statement.ru
ru
| DNSSEC | ๐ Signed (DS record present) | ||||||
| NS | a.dns.ripn.net โญ | ||||||
| NS | b.dns.ripn.net | ||||||
| NS | c.tld-servers.ru | ||||||
| NS | d.dns.ripn.net | ||||||
| NS | e.dns.ripn.net | ||||||
| NS | f.dns.ripn.net | ||||||
| SOA | a.dns.ripn.nethostmaster@ripn.net serial=4071141 | ||||||
Same first word
method-statement.pages.dev |
method-statement.ru |
method-statement.com |
DNS History
4 records (4 active, 0 former)
โA178.132.201.542026-08-19 โ 2026-11-18 ยท 2 obs
โ 2026-11-18 17:31:34
๐ DNS Trace
๐ Delegation Chain
| Zone | Nameservers | Glue |
|---|---|---|
| ru | f.dns.ripn.net, b.dns.ripn.net, d.dns.ripn.net, a.dns.ripn.net... | - |
| method-statement.ru | ns2.reg.ru, ns1.reg.ru | 20 records |
โ Authoritative Response
Server:176.99.13.12
NS records: ns2.reg.ru, ns1.reg.ru
๐ DNSSEC Status
โ ๏ธ Insecure (no DNSSEC)
No DS record for method-statement.ru (unsigned zone)
โฑ๏ธ Timing
Total: 1716ms | Queries: -
๐ Records
| Type | Count | Sample Data |
|---|---|---|
| A | 1 | 178.132.201.54 |
| NS | 2 | ns1.reg.ru, ns2.reg.ru |
| MX | 1 | emx.mail.ru (pri: 10) |
| TXT | 1 | v=spf1 redirect=_spf.mail.ru |
| SOA | 1 | ns1.reg.ru hostmaster.ns1.reg.ru |
๐ Glue Records Collected
Total: 20
Out-of-bailiwick: 20 (ns2.reg.ru, ns2.reg.ru, ns2.reg.ru...)
Analysis
IP Addresses
method-statement.ru resolves to one IP address: 178.132.201.54.
Name Servers
DNS delegation for method-statement.ru points to two name servers: ns1.reg.ru and ns2.reg.ru.
Host names with 10 IP numbers:
The host name ns1.reg.ru points to: 176.99.13.11, 176.99.13.13, 176.99.13.15 and 7 other.
The host name ns2.reg.ru points to: 176.99.13.12, 176.99.13.14, 176.99.13.16 and 7 other.
Mail Servers
Mail for method-statement.ru is handled by a single mail server, emx.mail.ru.
The host name emx.mail.ru points to two IP numbers: 94.100.180.180 and 217.69.139.180.