thewilliamsproject.org - robtex.com

thewilliamsproject.org

DNSSEC⚠️ Not signed
A2606:4700:3037::6815:355dπŸ‡ΊπŸ‡Έ Cloudflare2606:4700:3037::/48 , Inc. 101 Townsend Street, San Francisco, California 94107, US βœ“ In HTTPS hints
A2606:4700:3037::ac43:d336πŸ‡ΊπŸ‡Έ Cloudflare2606:4700:3037::/48 , Inc. 101 Townsend Street, San Francisco, California 94107, US βœ“ In HTTPS hints
A104.21.53.93Cloudflare104.21.48.0/20 , Inc. 101 Townsend Street, San Francisco, California 94107, US βœ“ In HTTPS hints
A172.67.211.54πŸ‡ΊπŸ‡Έ Cloudflare172.67.208.0/20 , Inc. 101 Townsend Street, San Francisco, California 94107, US βœ“ In HTTPS hints
NSeric.ns.cloudflare.com ⭐
A2606:4700:58::adf5:3b70πŸ‡ΊπŸ‡Έ Cloudflare2606:4700:50::/44 , Inc. 101 Townsend Street, San Francisco, California 94107, US
PTReric.ns.cloudflare.com
A2803:f800:50::6ca2:c170πŸ‡¨πŸ‡· Cloudflare2803:f800:50::/45 LACNIC generated route6 for CloudFlare Latin America S.R.L
PTReric.ns.cloudflare.com
A2a06:98c1:50::ac40:2170πŸ‡ΊπŸ‡Έ Cloudflare2a06:98c1:50::/45
PTReric.ns.cloudflare.com
A108.162.193.112πŸ‡ΊπŸ‡Έ Cloudflare108.162.193.0/24 , Inc. 101 Townsend Street, San Francisco, California 94107, US
PTReric.ns.cloudflare.com
A172.64.33.112πŸ‡ΊπŸ‡Έ Cloudflare172.64.33.0/24 , Inc. 101 Townsend Street, San Francisco, California 94107, US
PTReric.ns.cloudflare.com
A173.245.59.112πŸ‡ΊπŸ‡Έ Cloudflare173.245.59.0/24 , Inc. 101 Townsend Street, San Francisco, California 94107, US
PTReric.ns.cloudflare.com
NSmagdalena.ns.cloudflare.com
A2606:4700:50::a29f:2608πŸ‡ΊπŸ‡Έ Cloudflare2606:4700:50::/44 , Inc. 101 Townsend Street, San Francisco, California 94107, US
PTRmagdalena.ns.cloudflare.com
A2803:f800:50::6ca2:c208πŸ‡¨πŸ‡· Cloudflare2803:f800:50::/45 LACNIC generated route6 for CloudFlare Latin America S.R.L
PTRmagdalena.ns.cloudflare.com
A2a06:98c1:50::ac40:2208πŸ‡ΊπŸ‡Έ Cloudflare2a06:98c1:50::/45
PTRmagdalena.ns.cloudflare.com
A108.162.194.8πŸ‡ΊπŸ‡Έ Cloudflare108.162.194.0/24 , Inc. 101 Townsend Street, San Francisco, California 94107, US
PTRmagdalena.ns.cloudflare.com
A162.159.38.8Cloudflare162.159.32.0/20 , Inc. 101 Townsend Street, San Francisco, California 94107, US
PTRmagdalena.ns.cloudflare.com
A172.64.34.8πŸ‡ΊπŸ‡Έ Cloudflare172.64.34.0/24 , Inc. 101 Townsend Street, San Francisco, California 94107, US
PTRmagdalena.ns.cloudflare.com
HTTPSHTTP/3, HTTP/2 βœ“ hints match
IPv4 hints104.21.53.93, 172.67.211.54
IPv6 hints2606:4700:3037::6815:355d, 2606:4700:3037::ac43:d336
ECHX25519, HKDF-SHA256 + AES-128-GCM draft, id=23, name=cloudflare-ech.com
SOAeric.ns.cloudflare.comdns@cloudflare.com serial=2399984297

org

DNSSECπŸ”’ Signed (DS record present)
NSa0.org.afilias-nst.info ⭐ ⚠️ Not in parent delegation
NSa2.org.afilias-nst.info ⚠️ Not in parent delegation
NSb0.org.afilias-nst.org
NSb2.org.afilias-nst.org
NSc0.org.afilias-nst.info ⚠️ Not in parent delegation
NSd0.org.afilias-nst.org
SOAa0.org.afilias-nst.infohostmaster@donuts.email serial=1775243872

Same first word

DNS History

6 records (6 active, 0 former)

NSeric.ns.cloudflare.commagdalena.ns.cloudflare.comA104.21.53.93172.67.211.542606:4700:3037::6815:355d2606:4700:3037::ac43:d336
●NSeric.ns.cloudflare.com2026-03-22 β†’ 2026-04-03 Β· 2 obs
● 2026-03-22 04:01:38
● 2026-04-03 19:24:56
●NSmagdalena.ns.cloudflare.com2026-03-22 β†’ 2026-04-03 Β· 2 obs
● 2026-03-22 04:01:38
● 2026-04-03 19:24:56
●A104.21.53.932026-03-22 β†’ 2026-04-03 Β· 2 obs
● 2026-03-22 04:01:38
● 2026-04-03 19:24:56
●A172.67.211.542026-03-22 β†’ 2026-04-03 Β· 2 obs
● 2026-03-22 04:01:38
● 2026-04-03 19:24:56
●A2606:4700:3037::6815:355d2026-03-22 β†’ 2026-04-03 Β· 2 obs
● 2026-03-22 04:01:38
● 2026-04-03 19:24:56
●A2606:4700:3037::ac43:d3362026-03-22 β†’ 2026-04-03 Β· 2 obs
● 2026-03-22 04:01:38
● 2026-04-03 19:24:56

πŸ” DNS Trace

πŸ“‹ Delegation Chain

ZoneNameserversGlue
orgb0.org.afilias-nst.org, b2.org.afilias-nst.org, d0.org.afilias-nst.org-
thewilliamsproject.orgeric.ns.cloudflare.com, magdalena.ns.cloudflare.com-

βœ… Authoritative Response

Server:172.64.33.112

NS records: eric.ns.cloudflare.com, magdalena.ns.cloudflare.com

πŸ”’ DNSSEC Status

⚠️ Insecure (no DNSSEC)

No DS record for thewilliamsproject.org (unsigned zone)

⏱️ Timing

Total: 573ms | Queries: -

πŸ“„ Records

TypeCountSample Data
A2172.67.211.54, 104.21.53.93
AAAA22606:4700:3037::6815:355d, 2606:4700:3037::ac43:d336
NS2eric.ns.cloudflare.com, magdalena.ns.cloudflare.com
HTTPS1{"priority":1,"target":".","alpn":["h3",
SOA1eric.ns.cloudflare.com dns.cloudflare.co

Analysis

IP Addresses

thewilliamsproject.org maps to four IP numbers: 2606:4700:3037::6815:355d, 2606:4700:3037::ac43:d336, 104.21.53.93 and 172.67.211.54.

Other host names, for instance thriveim.com, concretegong.co.uk, www.ddkongbao.com, stoneunit.ru and meghacargo.com share IP numbers with thewilliamsproject.org.

Name Servers

Two name servers eric.ns.cloudflare.com and magdalena.ns.cloudflare.com are delegated to thewilliamsproject.org.

thewilliamsproject.org uses the same name server configuration as other domains, such as 7musts.com, ylce.pt, timesamara.ru, dui805.com and powerslide.io.

thewilliamsproject.org at least partially shares name servers with other domains such as hyper360synergy.click, innersuninc.com, alphamediahub.click, efeel.de and keponih.com.

These name servers are commonly used with jason.ns.cloudflare.com and pam.ns.cloudflare.com.

Host names with six IP numbers: Host name eric.ns.cloudflare.com points to 2606:4700:58::adf5:3b70, 2803:f800:50::6ca2:c170, 2a06:98c1:50::ac40:2170, 108.162.193.112, 172.64.33.112 and 173.245.59.112; host name magdalena.ns.cloudflare.com points to 2606:4700:50::a29f:2608, 2803:f800:50::6ca2:c208, 2a06:98c1:50::ac40:2208, 108.162.194.8, 162.159.38.8 and 172.64.34.8.