thesystemsproject.com - robtex.com
thesystemsproject.com
com
| DNSSEC | π Signed (DS record present) | ||||||
| NS | a.gtld-servers.net β | ||||||
| NS | b.gtld-servers.net | ||||||
| NS | c.gtld-servers.net | ||||||
| NS | d.gtld-servers.net | ||||||
| NS | e.gtld-servers.net | ||||||
| NS | f.gtld-servers.net | ||||||
| NS | g.gtld-servers.net | ||||||
| NS | h.gtld-servers.net | ||||||
| NS | i.gtld-servers.net | ||||||
| NS | j.gtld-servers.net | ||||||
| NS | k.gtld-servers.net | ||||||
| NS | l.gtld-servers.net | ||||||
| NS | m.gtld-servers.net | ||||||
| SOA | a.gtld-servers.netnstld@verisign-grs.com serial=1771291435 | ||||||
Same first word
thesystemsproject.com |
DNS History
9 records (5 active, 4 former)
βNSns1.crazydomains.com2019-12-14 β 2019-12-14 Β· 3 obs
β 2026-03-23 15:41:44
β 2026-03-23 15:41:46
βNSns1.dnspackage.com2026-03-23 β 2026-03-23 Β· 3 obs
β 2026-03-23 15:41:44
β 2026-03-23 15:41:46
βNSns2.crazydomains.com2019-12-14 β 2019-12-14 Β· 3 obs
β 2026-03-23 15:41:44
β 2026-03-23 15:41:46
βNSns2.dnspackage.com2026-03-23 β 2026-03-23 Β· 3 obs
β 2026-03-23 15:41:44
β 2026-03-23 15:41:46
βNSns3.dnspackage.com2026-03-23 β 2026-03-23 Β· 3 obs
β 2026-03-23 15:41:44
β 2026-03-23 15:41:46
βNSns4.dnspackage.com2026-03-23 β 2026-03-23 Β· 3 obs
β 2026-03-23 15:41:44
β 2026-03-23 15:41:46
βA103.67.235.1202019-12-14 β 2019-12-14 Β· 3 obs
β 2026-03-23 15:41:44
β 2026-03-23 15:41:46
βA185.158.133.12026-03-23 β 2026-03-23 Β· 3 obs
β 2026-03-23 15:41:44
β 2026-03-23 15:41:46
βA198.202.211.12026-03-23 β 2026-03-23 Β· 2 obs
β 2026-03-23 15:41:46
π DNS Trace
π Delegation Chain
| Zone | Nameservers | Glue |
|---|---|---|
| com | k.gtld-servers.net, g.gtld-servers.net, f.gtld-servers.net, i.gtld-servers.net... | - |
| thesystemsproject.com | ns1.dnspackage.com, ns2.dnspackage.com | 3 records |
β Authoritative Response
Server:199.247.153.53
NS records: ns1.dnspackage.com, ns2.dnspackage.com
π DNSSEC Status
β οΈ Insecure (no DNSSEC)
No DS record for thesystemsproject.com (unsigned zone)
β±οΈ Timing
Total: 271ms | Queries: -
π Records
| Type | Count | Sample Data |
|---|---|---|
| A | 1 | 185.158.133.1 |
| NS | 4 | ns1.dnspackage.com, ns2.dnspackage.com... |
| SOA | 1 | ns1.dnspackage.com admin.sectigo.com |
π Glue Records Collected
Total: 3
Out-of-bailiwick: 3 (ns1.dnspackage.com, ns1.dnspackage.com, ns2.dnspackage.com)
Analysis
IP Addresses
thesystemsproject.com maps to IP address 185.158.133.1.
Other host names, for instance confere-direitos.cfd, marmitadelivery.store, beleevit.com, kroger.se and privhat.com share IP numbers with thesystemsproject.com.
Name Servers
thesystemsproject.com is delegated to four name servers: ns1.dnspackage.com, ns2.dnspackage.com, ns3.dnspackage.com and ns4.dnspackage.com.
thesystemsproject.com at least partially shares name servers with other domains such as thegoodiebag.com.au, konsign.com, superlink.net.au, muzz.com.au and infocouncil.biz.
Host names with two IP numbers:
ns1.dnspackage.com points to 2400:cb00:2049:1::a29f:1804 and 162.159.24.4
ns2.dnspackage.com points to 2620:111:8005::53 and 199.247.153.53
ns3.dnspackage.com points to 2400:cb00:2049:1::a29f:1a04 and 162.159.26.4
ns4.dnspackage.com points to 2620:111:8007::53 and 199.247.155.53