streamsproject.com - robtex.com
streamsproject.com
com
| DNSSEC | π Signed (DS record present) | ||||||
| NS | a.gtld-servers.net β | ||||||
| NS | b.gtld-servers.net | ||||||
| NS | c.gtld-servers.net | ||||||
| NS | d.gtld-servers.net | ||||||
| NS | e.gtld-servers.net | ||||||
| NS | f.gtld-servers.net | ||||||
| NS | g.gtld-servers.net | ||||||
| NS | h.gtld-servers.net | ||||||
| NS | i.gtld-servers.net | ||||||
| NS | j.gtld-servers.net | ||||||
| NS | k.gtld-servers.net | ||||||
| NS | l.gtld-servers.net | ||||||
| NS | m.gtld-servers.net | ||||||
| SOA | a.gtld-servers.netnstld@verisign-grs.com serial=1774667812 | ||||||
Same first word
streamsproject.com |
Similar names
DNS History
9 records (9 active, 0 former)
βNSns29.domaincontrol.com2026-02-22 β 2026-03-28 Β· 2 obs
β 2026-03-28 03:42:00
βNSns30.domaincontrol.com2026-02-22 β 2026-03-28 Β· 2 obs
β 2026-03-28 03:42:00
βMXalt1.aspmx.l.google.com2026-02-22 β 2026-03-28 Β· 2 obs
β 2026-03-28 03:42:00
βMXalt2.aspmx.l.google.com2026-02-22 β 2026-03-28 Β· 2 obs
β 2026-03-28 03:42:00
βMXalt3.aspmx.l.google.com2026-02-22 β 2026-03-28 Β· 2 obs
β 2026-03-28 03:42:00
βMXalt4.aspmx.l.google.com2026-02-22 β 2026-03-28 Β· 2 obs
β 2026-03-28 03:42:00
βMXaspmx.l.google.com2026-02-22 β 2026-03-28 Β· 2 obs
β 2026-03-28 03:42:00
βA15.197.148.332026-02-22 β 2026-03-28 Β· 2 obs
β 2026-03-28 03:42:00
βA3.33.130.1902026-02-22 β 2026-03-28 Β· 2 obs
β 2026-03-28 03:42:00
π DNS Trace
π Delegation Chain
| Zone | Nameservers | Glue |
|---|---|---|
| com | l.gtld-servers.net, j.gtld-servers.net, h.gtld-servers.net, d.gtld-servers.net... | - |
| streamsproject.com | ns29.domaincontrol.com, ns30.domaincontrol.com | 4 records |
β Authoritative Response
Server:173.201.72.15
NS records: ns29.domaincontrol.com, ns30.domaincontrol.com
π DNSSEC Status
β οΈ Insecure (no DNSSEC)
No DS record for streamsproject.com (unsigned zone)
β±οΈ Timing
Total: 164ms | Queries: -
π Records
| Type | Count | Sample Data |
|---|---|---|
| A | 2 | 3.33.130.190, 15.197.148.33 |
| NS | 2 | ns29.domaincontrol.com, ns30.domaincontrol.com |
| MX | 5 | aspmx.l.google.com (pri: 1), alt1.aspmx.l.google.com (pri: 5)... |
| TXT | 2 | v=spf1 include:dc-aa8e722993._spfm.strea, google-site-verification=z4tpGdwuqu47-lh |
| SOA | 1 | ns29.domaincontrol.com dns.jomax.net |
π Glue Records Collected
Total: 4
Out-of-bailiwick: 4 (ns29.domaincontrol.com, ns29.domaincontrol.com, ns30.domaincontrol.com...)
Analysis
IP Addresses
streamsproject.com resolves to two IPs: 3.33.130.190 and 15.197.148.33.
other host names for instance insurancecoverageexpert.com, n2pros.com, usedvisualfields.com, kanishkacollections.com and medicationvsmeditation.com share IP numbers with streamsproject.com.
Name Servers
streamsproject.com is delegated to two name servers: ns29.domaincontrol.com and ns30.domaincontrol.com.
streamsproject.com shares the same name server setup as other domains, for example roomforrentdallas.com, msnps.com, tensorproducts.com, herblissity.com and 1amz.com.
Host names with two IP numbers:
ns29.domaincontrol.com points to 2603:5:2181::f and 97.74.104.15
ns30.domaincontrol.com points to 2603:5:2281::f and 173.201.72.15
Mail Servers
streamsproject.com is handled by five mail servers: aspmx.l.google.com, alt1.aspmx.l.google.com, alt2.aspmx.l.google.com, alt3.aspmx.l.google.com and alt4.aspmx.l.google.com.
streamsproject.com shares mail servers with other domains at least partially, including ns500698.ns500759.ns500759.ns500759.ns500736.ns500698.ns500698.ns500735.ns500736.ns500708.ns500698.ns500698.ns500619.ns500686.ns500619.ns500576.trackreceptor.com, ns500758.ns500758.ns500698.ns500758.ns500698.ns500758.ns500735.ns500698.ns500735.ns500735.ns500708.ns500576.ns500576.ns500576.ns500619.ns500619.trackreceptor.com, ns500742.ns500754.ns500754.ns500754.ns500742.ns500705.ns500678.ns500704.ns500678.ns500291.ns500649.tenderladiesbz.com, ns500671.ns500742.ns500742.ns500742.ns500754.ns500704.ns500671.ns500649.ns500688.ns500649.ns500649.ns500666.tenderladiesbz.com and ns500731.ns500671.ns500754.ns500671.ns500742.ns500671.ns500704.ns500704.ns500671.ns500688.ns500688.ns500649.ns500666.lustychickser.com.
these mail servers are often used with the mail servers aspmx3.googlemail.com, aspmx2.googlemail.com, aspmx4.googlemail.com and aspmx5.googlemail.com.
Hosts with two IP numbers:
aspmx.l.google.com points to 2a00:1450:4009:c0f::1a and 172.217.76.26.
alt1.aspmx.l.google.com points to 2a00:1450:4025:402::1b and 142.250.102.27.
alt2.aspmx.l.google.com points to 2a00:1450:4013:c1e::1b and 192.178.213.26.
alt3.aspmx.l.google.com points to 2607:f8b0:4023:3003::1a and 172.253.145.26.
alt4.aspmx.l.google.com points to 2a00:1450:4025:c01::1a and 142.250.147.26.