shamsproject.com - robtex.com
shamsproject.com
| DNSSEC | โ ๏ธ Not signed | ||||||
| A | 62.60.206.133๐ฎ๐ท Hostiran-Network62.60.206.0/24 HOSTIRAN | ||||||
| PTR | 62.60.206.133.static.hostiran.name | ||||||
| NS | ns1.shamswebdesign.com โญ | ||||||
| NS | ns1.hostiran.net โ ๏ธ Not in parent delegation | ||||||
| A | 37.27.81.177๐ซ๐ฎ Hetzner37.27.0.0/16 HETZNER-DC | ||||||
| PTR | ns1.hostiran.net | ||||||
| NS | ns2.hostiran.net | ||||||
| A | 5.144.130.130๐ฎ๐ท Hostiran-Network5.144.130.0/24 Hostiran Network | ||||||
| PTR | 5-144-130-130.static.hostiran.name | ||||||
| NS | ns2.shamswebdesign.com โ ๏ธ Not in zone NS records | ||||||
| MX | shamsproject.com โญ | ||||||
| A | 62.60.206.133๐ฎ๐ท Hostiran-Network62.60.206.0/24 HOSTIRAN | ||||||
| PTR | 62.60.206.133.static.hostiran.name | ||||||
| TXT | v=spf1 ip4:62.60.206.133 +a +mx ~all | ||||||
| SOA | ns1.shamswebdesign.comroot@cpanel-alma.centraldnserver.com 2026-02-10 #1 | ||||||
com
| DNSSEC | ๐ Signed (DS record present) | ||||||
| NS | a.gtld-servers.net โญ | ||||||
| NS | b.gtld-servers.net | ||||||
| NS | c.gtld-servers.net | ||||||
| NS | d.gtld-servers.net | ||||||
| NS | e.gtld-servers.net | ||||||
| NS | f.gtld-servers.net | ||||||
| NS | g.gtld-servers.net | ||||||
| NS | h.gtld-servers.net | ||||||
| NS | i.gtld-servers.net | ||||||
| NS | j.gtld-servers.net | ||||||
| NS | k.gtld-servers.net | ||||||
| NS | l.gtld-servers.net | ||||||
| NS | m.gtld-servers.net | ||||||
| SOA | a.gtld-servers.netnstld@verisign-grs.com serial=1771291435 | ||||||
MX for
shamsproject.com |
Same first word
shamsproject.com |
DNS History
6 records (6 active, 0 former)
โNSns1.hostiran.net2026-02-14 โ 2026-03-23 ยท 4 obs
โ 2026-02-18 02:41:16
โ 2026-02-18 14:02:30
โ 2026-03-23 14:13:16
โNSns1.shamswebdesign.com2026-02-18 โ 2026-03-23 ยท 5 obs
โ 2026-02-18 02:41:16
โ 2026-02-18 14:02:30
โ 2026-02-21 00:33:08
โ 2026-03-23 14:13:16
โNSns2.hostiran.net2026-02-14 โ 2026-03-23 ยท 2 obs
โ 2026-03-23 14:13:16
โNSns2.shamswebdesign.com2026-02-14 โ 2026-03-23 ยท 2 obs
โ 2026-03-23 14:13:16
โMXshamsproject.com2026-02-14 โ 2026-03-23 ยท 2 obs
โ 2026-03-23 14:13:16
โA62.60.206.1332026-02-14 โ 2026-03-23 ยท 2 obs
โ 2026-03-23 14:13:16
๐ DNS Trace
Analysis
Mail Server Role
shamsproject.com serves as the mail server for shamsproject.com.
IP Addresses
shamsproject.com points to a single IP address: 62.60.206.133.
Other host names such as energichouse.com and 62.60.206.133.static.hostiran.name share IP numbers with shamsproject.com.
Name Servers
shamsproject.com is delegated to four name servers: ns1.shamswebdesign.com, ns2.shamswebdesign.com, ns1.hostiran.net and ns2.hostiran.net.
At least part of the name servers for shamsproject.com are shared with other domains, for instance minooasal.ir, ikook.ir, ariadanak.com, luxabco.com and vinoplast.com.
Hostnames with a single IP
ns1.hostiran.net resolves to: 37.27.81.177.
ns2.hostiran.net resolves to: 5.144.130.130.
Mail Servers
Mail for shamsproject.com is handled by a single mail server, shamsproject.com.
Host shamsproject.com points to IP 62.60.206.133.