problemsprojects.com - robtex.com
problemsprojects.com
| DNSSEC | ⚠️ Not signed | ||||||
| A | 204.11.56.246🇻🇬 CONFLUENCE-NETWORK-INC204.11.56.0/24 | ||||||
| NS | ns1.bluehost.com ⭐ | ||||||
| A | 162.159.24.80Cloudflare162.159.24.0/24 , Inc. 101 Townsend Street, San Francisco, California 94107, US | ||||||
| PTR | ns1.bluehost.com | ||||||
| NS | ns2.bluehost.com | ||||||
| A | 162.159.25.175Cloudflare162.159.25.0/24 , Inc. 101 Townsend Street, San Francisco, California 94107, US | ||||||
| PTR | ns2.bluehost.com | ||||||
| SOA | NS1.BLUEHOST.comroot@BLUEHOST.com serial=126102005 | ||||||
com
| DNSSEC | 🔒 Signed (DS record present) | ||||||
| NS | a.gtld-servers.net ⭐ | ||||||
| NS | b.gtld-servers.net | ||||||
| NS | c.gtld-servers.net | ||||||
| NS | d.gtld-servers.net | ||||||
| NS | e.gtld-servers.net | ||||||
| NS | f.gtld-servers.net | ||||||
| NS | g.gtld-servers.net | ||||||
| NS | h.gtld-servers.net | ||||||
| NS | i.gtld-servers.net | ||||||
| NS | j.gtld-servers.net | ||||||
| NS | k.gtld-servers.net | ||||||
| NS | l.gtld-servers.net | ||||||
| NS | m.gtld-servers.net | ||||||
| SOA | a.gtld-servers.netnstld@verisign-grs.com serial=1795867528 | ||||||
Same first word
problemsprojects.com |
Previous names
Next names
DNS History
3 records (3 active, 0 former)
●NSns1.bluehost.com2026-11-03 → 2026-11-28 · 2 obs
● 2026-11-28 12:22:12
●NSns2.bluehost.com2026-11-03 → 2026-11-28 · 2 obs
● 2026-11-28 12:22:12
●A204.11.56.2462026-11-03 → 2026-11-28 · 2 obs
● 2026-11-28 12:22:12
🔍 DNS Trace
📋 Delegation Chain
| Zone | Nameservers | Glue |
|---|---|---|
| com | i.gtld-servers.net, k.gtld-servers.net, j.gtld-servers.net, f.gtld-servers.net... | - |
| problemsprojects.com | ns1.bluehost.com, ns2.bluehost.com | 2 records |
✅ Authoritative Response
Server:162.159.25.175
NS records: ns1.bluehost.com, ns2.bluehost.com
🔒 DNSSEC Status
⚠️ Insecure (no DNSSEC)
No DS record for problemsprojects.com (unsigned zone)
⏱️ Timing
Total: 436ms | Queries: -
📄 Records
| Type | Count | Sample Data |
|---|---|---|
| A | 1 | 204.11.56.246 |
| NS | 2 | ns2.bluehost.com, ns1.bluehost.com |
| SOA | 1 | NS1.BLUEHOST.com root.BLUEHOST.com |
📌 Glue Records Collected
Total: 2
Out-of-bailiwick: 2 (ns1.bluehost.com, ns2.bluehost.com)
Analysis
IP Addresses
problemsprojects.com has exactly one IP address — 204.11.56.246.
towa-logistics.online, cliffwork.online, letroismille.com plus two other host names have IP numbers in common with problemsprojects.com.
Name Servers
problemsprojects.com uses two name servers for its delegation: ns1.bluehost.com and ns2.bluehost.com.
The name server configuration of problemsprojects.com is shared with other domains, for instance beyondgiant.com, summervolunteer.org, werewatchingwhat.com and two others.
The name servers for problemsprojects.com overlap at least in part with those of other domains, including durango-bayfield-landscaping.com and samkanta.com.
Both ns1.bluehost.com and ns2.bluehost.com have a single IP address each — ns1.bluehost.com resolves to 162.159.24.80 while ns2.bluehost.com resolves to 162.159.25.175.