pmsproject.com - robtex.com
pmsproject.com
com
| DNSSEC | π Signed (DS record present) | ||||||
| NS | a.gtld-servers.net β | ||||||
| NS | b.gtld-servers.net | ||||||
| NS | c.gtld-servers.net | ||||||
| NS | d.gtld-servers.net | ||||||
| NS | e.gtld-servers.net | ||||||
| NS | f.gtld-servers.net | ||||||
| NS | g.gtld-servers.net | ||||||
| NS | h.gtld-servers.net | ||||||
| NS | i.gtld-servers.net | ||||||
| NS | j.gtld-servers.net | ||||||
| NS | k.gtld-servers.net | ||||||
| NS | l.gtld-servers.net | ||||||
| NS | m.gtld-servers.net | ||||||
| SOA | a.gtld-servers.netnstld@verisign-grs.com serial=1778716136 | ||||||
Previously MX for
pmsproject.com |
Same first word
pmsproject.com |
Similar names
DNS History
18 records (10 active, 8 former)
βNScns407.hostgator.com2017-12-22 β 2017-12-22 Β· 4 obs
β 2017-12-22 12:43:54
β 2026-04-02 09:34:24
β 2026-05-13 23:55:44
βNScns408.hostgator.com2017-12-22 β 2017-12-22 Β· 4 obs
β 2017-12-22 12:43:54
β 2026-04-02 09:34:24
β 2026-05-13 23:55:44
βNSns1.host-ed.me2015-08-22 β 2016-12-28 Β· 4 obs
β 2016-12-28 23:19:22
β 2017-12-22 12:43:54
β 2026-05-13 23:55:44
βNSns2.host-ed.me2015-08-22 β 2016-12-28 Β· 4 obs
β 2016-12-28 23:19:22
β 2017-12-22 12:43:54
β 2026-05-13 23:55:44
βNSns8.wixdns.net2026-04-02 β 2026-05-13 Β· 3 obs
β 2026-04-02 09:34:24
β 2026-05-13 23:55:44
βNSns9.wixdns.net2026-04-02 β 2026-05-13 Β· 3 obs
β 2026-04-02 09:34:24
β 2026-05-13 23:55:44
βMXalt1.aspmx.l.google.com2026-04-02 β 2026-05-13 Β· 3 obs
β 2026-04-02 09:34:24
β 2026-05-13 23:55:44
βMXalt2.aspmx.l.google.com2026-04-02 β 2026-05-13 Β· 3 obs
β 2026-04-02 09:34:24
β 2026-05-13 23:55:44
βMXalt3.aspmx.l.google.com2026-04-02 β 2026-05-13 Β· 3 obs
β 2026-04-02 09:34:24
β 2026-05-13 23:55:44
βMXalt4.aspmx.l.google.com2026-04-02 β 2026-05-13 Β· 3 obs
β 2026-04-02 09:34:24
β 2026-05-13 23:55:44
βMXaspmx.l.google.com2026-04-02 β 2026-05-13 Β· 3 obs
β 2026-04-02 09:34:24
β 2026-05-13 23:55:44
βMXmail.pmsproject.com2017-12-22 β 2017-12-22 Β· 4 obs
β 2017-12-22 12:43:54
β 2026-04-02 09:34:24
β 2026-05-13 23:55:44
βMXpmsproject.com2015-08-22 β 2016-12-28 Β· 4 obs
β 2016-12-28 23:19:22
β 2017-12-22 12:43:54
β 2026-05-13 23:55:44
βA185.230.63.1072026-04-02 β 2026-05-13 Β· 3 obs
β 2026-04-02 09:34:24
β 2026-05-13 23:55:44
βA185.230.63.1712026-04-02 β 2026-05-13 Β· 3 obs
β 2026-04-02 09:34:24
β 2026-05-13 23:55:44
βA185.230.63.1862026-04-02 β 2026-05-13 Β· 3 obs
β 2026-04-02 09:34:24
β 2026-05-13 23:55:44
βA50.116.93.112017-12-22 β 2017-12-22 Β· 4 obs
β 2017-12-22 12:43:54
β 2026-04-02 09:34:24
β 2026-05-13 23:55:44
βA79.133.61.1642015-08-22 β 2016-12-28 Β· 4 obs
β 2016-12-28 23:19:22
β 2017-12-22 12:43:54
β 2026-05-13 23:55:44
π DNS Trace
π Delegation Chain
| Zone | Nameservers | Glue |
|---|---|---|
| com | l.gtld-servers.net, i.gtld-servers.net, j.gtld-servers.net, b.gtld-servers.net... | - |
| pmsproject.com | ns8.wixdns.net, ns9.wixdns.net | - |
β Authoritative Response
Server:216.239.34.101
NS records: ns8.wixdns.net, ns9.wixdns.net
π DNSSEC Status
β οΈ Insecure (no DNSSEC)
No DS record for pmsproject.com (unsigned zone)
β±οΈ Timing
Total: 1008ms | Queries: -
π Records
| Type | Count | Sample Data |
|---|---|---|
| A | 3 | 185.230.63.107, 185.230.63.186... |
| NS | 2 | ns8.wixdns.net, ns9.wixdns.net |
| MX | 5 | alt3.aspmx.l.google.com (pri: 40), alt1.aspmx.l.google.com (pri: 20)... |
| TXT | 1 | google-site-verification=aq9b0Knbp28RCnH |
| SOA | 1 | ns8.wixdns.net support.wix.com |
Analysis
IP Addresses
pmsproject.com points to three IP numbers: 185.230.63.107, 185.230.63.171 and 185.230.63.186.
Other host names including andreafrankhomes.com, antidote-expertise.fr, berger-immo.de, roofconsultant.org and flexiheater.se share IP numbers with pmsproject.com.
Name Servers
pmsproject.com's delegation uses two name servers, ns8.wixdns.net and ns9.wixdns.net.
pmsproject.com shares the same name server setup as other domains, for example aloptom.com, wnynotary.com, goetsch.media, josh-poole.com and akazzo.com.br.
pmsproject.com at least partially shares name servers with other domains; for instance heartland-gc.com.
Host names with a single IP:
ns8.wixdns.net points to 216.239.32.101.
ns9.wixdns.net points to 216.239.34.101.
Mail Servers
pmsproject.com is handled by five mail servers: aspmx.l.google.com, alt1.aspmx.l.google.com, alt2.aspmx.l.google.com, alt3.aspmx.l.google.com and alt4.aspmx.l.google.com.
The mail servers for pmsproject.com are shared with other domains, for instance ns500754.ns500731.ns500731.ns500671.ns500671.ns500671.ns500291.ns500291.ns500666.tenderladiesbz.com, ns500754.ns500754.ns500731.ns500754.ns500704.ns500688.ns500678.ns500704.ns500291.ns500131.lustychickser.com, ns500734.ns500693.ns500693.ns500734.ns500699.ns500734.ns500683.ns500683.ns500693.ns500612.ns500632.ns500632.ns500632.dtrkdll.com, ns500698.ns500759.ns500735.ns500735.ns500735.ns500735.ns500698.ns500735.ns500708.ns500698.ns500652.ns500619.ns500619.trackreceptor.com and ns500754.ns500731.ns500742.ns500754.ns500704.ns500731.ns500671.ns500688.ns500678.ns500688.ns500649.ns500678.ns500291.ns500131.lustychickser.com.
These mail servers are commonly used alongside aspmx2.googlemail.com and aspmx3.googlemail.com.
Host names with two IP numbers:
aspmx.l.google.com points to 2607:f8b0:4004:c25::1a and 142.251.16.26.
alt1.aspmx.l.google.com points to 2800:3f0:4003:c0f::1a and 108.177.123.27.
alt2.aspmx.l.google.com points to 2607:f8b0:4023:3003::1b and 172.253.145.26.
alt3.aspmx.l.google.com points to 2a00:1450:4009:c0f::1b and 192.178.223.26.
alt4.aspmx.l.google.com points to 2a00:1450:400c:c00::1a and 173.194.76.26.