www.platformsproject.com - robtex.com
www.platformsproject.com
| CNAME | platformsproject.com | ||||||
| DNSSEC | โ ๏ธ Not signed | ||||||
| A | 2a00:1c98:1010:1::97๐ง๐ช COMBELL-AS2a00:1c98::/32 COMBELL Network | ||||||
| PTR | linux2727.grserver.gr | ||||||
| A | 213.158.90.162๐ฎ๐น COMBELL-AS213.158.90.0/24 Enartia services in Belgium | ||||||
| NS | ns155.grserver.gr โญ | ||||||
| A | 2a00:1c98:1010:1::97๐ง๐ช COMBELL-AS2a00:1c98::/32 COMBELL Network | ||||||
| PTR | linux2727.grserver.gr | ||||||
| A | 213.158.90.162๐ฎ๐น COMBELL-AS213.158.90.0/24 Enartia services in Belgium | ||||||
| PTR | linux2727.grserver.gr | ||||||
| NS | ns156.grserver.gr | ||||||
| A | 2a00:1c98:1010:1::97๐ง๐ช COMBELL-AS2a00:1c98::/32 COMBELL Network | ||||||
| PTR | linux2727.grserver.gr | ||||||
| A | 213.158.90.162๐ฎ๐น COMBELL-AS213.158.90.0/24 Enartia services in Belgium | ||||||
| PTR | linux2727.grserver.gr | ||||||
| MX | mail.platformsproject.com โญ | ||||||
| A | 2a00:1c98:1010:1::97๐ง๐ช COMBELL-AS2a00:1c98::/32 COMBELL Network | ||||||
| PTR | linux2727.grserver.gr | ||||||
| A | 213.158.90.162๐ฎ๐น COMBELL-AS213.158.90.0/24 Enartia services in Belgium | ||||||
| PTR | linux2727.grserver.gr | ||||||
| TXT | v=spf1 +a +mx include:_spf.fastmail.gr -all | ||||||
| SOA | ns155.grserver.grhostmaster@grserver.gr 2026-01-13 #2 | ||||||
platformsproject.com
| DNSSEC | โ ๏ธ Not signed | ||||||
| A | 2a00:1c98:1010:1::97๐ง๐ช COMBELL-AS2a00:1c98::/32 COMBELL Network | ||||||
| A | 213.158.90.162๐ฎ๐น COMBELL-AS213.158.90.0/24 Enartia services in Belgium | ||||||
| NS | ns155.grserver.gr โญ | ||||||
| NS | ns156.grserver.gr | ||||||
| MX | mail.platformsproject.com โญ | ||||||
| TXT | v=spf1 +a +mx include:_spf.fastmail.gr -all | ||||||
| SOA | ns155.grserver.grhostmaster@grserver.gr 2026-01-13 #2 | ||||||
Same first word
Similar names
DNS History
1 record (1 active, 0 former)
โCNAMEplatformsproject.com2018-05-15 โ 2026-04-29 ยท 2 obs
โ 2026-04-29 18:25:12
๐ DNS Trace
๐ Delegation Chain
| Zone | Nameservers | Glue |
|---|---|---|
| com | a.gtld-servers.net, b.gtld-servers.net, c.gtld-servers.net, d.gtld-servers.net... | - |
| platformsproject.com | ns155.grserver.gr, ns156.grserver.gr | - |
โ Authoritative Response
Server:213.158.90.162
NS records: ns155.grserver.gr, ns156.grserver.gr
๐ DNSSEC Status
โ ๏ธ Insecure (no DNSSEC)
No DS record for platformsproject.com (unsigned zone)
โฑ๏ธ Timing
Total: 661ms | Queries: -
๐ Records
| Type | Count | Sample Data |
|---|---|---|
| CNAME | 1 | platformsproject.com |
Analysis
IP Addresses
www.platformsproject.com points to two IP numbers: 2a00:1c98:1010:1::97 and 213.158.90.162.
Other host names, for instance mail.linuxzone78.grserver.gr, mail.paixto.gr, mail.irinikalaitzidi.com, linux2727.grserver.gr and ierapostoli.com share IP numbers with www.platformsproject.com.
Name Servers
Delegation for www.platformsproject.com rests with two name servers, ns155.grserver.gr and ns156.grserver.gr.
www.platformsproject.com shares the same name server setup as other domains, including mouglalis.gr, vapeport.gr, transcar.gr, akdesign.gr and alexandrabissa.com.
www.platformsproject.com shares name servers with other domains at least partially, for example ierapostoli.com.
Host names with two IP numbers:
ns155.grserver.gr points to 2a00:1c98:1010:1::97 and 213.158.90.162.
ns156.grserver.gr points to 2a00:1c98:1010:1::97 and 213.158.90.162.
Host names pointing to 2a00:1c98:1010:1::97: ns155.grserver.gr, ns156.grserver.gr.
Host names pointing to 213.158.90.162: ns155.grserver.gr, ns156.grserver.gr.
Mail Servers
www.platformsproject.com is handled by a single mail server, mail.platformsproject.com.
www.platformsproject.com uses the same mail server setup as other domains, such as platformsproject.com.
mail.platformsproject.com resolves to two IP numbers: 2a00:1c98:1010:1::97 and 213.158.90.162.