msprojectwbs.com - robtex.com

msprojectwbs.com

com

Same first word

DNS History

7 records (5 active, 2 former)

20162017201820192020202120222023202420252026NSns01.domaincontrol.comns02.domaincontrol.comMXmailstore1.secureserver.netsmtp.secureserver.netA88.99.145.86173.201.63.6350.62.39.12
●NSns01.domaincontrol.com2015-08-08 β†’ 2026-03-27 Β· 2 obs
● 2015-08-08 16:06:18
● 2026-03-27 00:03:24
●NSns02.domaincontrol.com2015-08-08 β†’ 2026-03-27 Β· 2 obs
● 2015-08-08 16:06:18
● 2026-03-27 00:03:24
●MXmailstore1.secureserver.net2015-08-08 β†’ 2026-03-27 Β· 2 obs
● 2015-08-08 16:06:18
● 2026-03-27 00:03:24
●MXsmtp.secureserver.net2015-08-08 β†’ 2026-03-27 Β· 2 obs
● 2015-08-08 16:06:18
● 2026-03-27 00:03:24
β—‹A173.201.63.632015-08-08 β†’ 2015-08-08 Β· 3 obs
● 2015-08-08 16:06:18
β—‹ 2015-12-08 00:54:10
β—‹ 2026-03-27 00:03:24
β—‹A50.62.39.122015-12-08 β†’ 2017-04-03 Β· 5 obs
β—‹ 2015-08-08 16:06:18
● 2015-12-08 00:54:10
● 2017-04-03 06:01:10
β—‹ 2020-02-28 21:58:30
β—‹ 2026-03-27 00:03:24
●A88.99.145.862020-02-28 β†’ 2026-03-27 Β· 3 obs
β—‹ 2017-04-03 06:01:10
● 2020-02-28 21:58:30
● 2026-03-27 00:03:24

πŸ” DNS Trace

πŸ“‹ Delegation Chain

ZoneNameserversGlue
comd.gtld-servers.net, e.gtld-servers.net, l.gtld-servers.net, a.gtld-servers.net...-
msprojectwbs.comns01.domaincontrol.com, ns02.domaincontrol.com4 records

βœ… Authoritative Response

Server:97.74.100.1

NS records: ns01.domaincontrol.com, ns02.domaincontrol.com

πŸ”’ DNSSEC Status

⚠️ Insecure (no DNSSEC)

No DS record for msprojectwbs.com (unsigned zone)

⏱️ Timing

Total: 146ms | Queries: -

πŸ“„ Records

TypeCountSample Data
A188.99.145.86
NS2ns01.domaincontrol.com, ns02.domaincontrol.com
MX2mailstore1.secureserver.net (pri: 10), smtp.secureserver.net (pri: 0)
SOA1ns01.domaincontrol.com dns.jomax.net

πŸ“Œ Glue Records Collected

Total: 4

Out-of-bailiwick: 4 (ns01.domaincontrol.com, ns01.domaincontrol.com, ns02.domaincontrol.com...)

Analysis

IP Addresses

msprojectwbs.com resolves to one IP number: 88.99.145.86.

other host names including matchware.com, workbreakdownstructureexamples.com, meetingbooster.com, productbreakdownstructure.com and workbreakdownstructuresoftware.com share IP numbers with msprojectwbs.com.

Name Servers

msprojectwbs.com is delegated to two name servers ns01.domaincontrol.com and ns02.domaincontrol.com.

msprojectwbs.com shares the same name server setup as other domains, for instance asgpension.com, haar-ms.com, active-bytes.com, mifiesta.mx and speersinteriors.ca.

msprojectwbs.com at least partially shares name servers with other domains, for instance resman.org.

Host names with two IP numbers:

The host name ns01.domaincontrol.com points to 2603:5:2140::1 and 97.74.100.1; the host name ns02.domaincontrol.com points to 2603:5:2240::1 and 173.201.68.1.

Mail Servers

Two mail servers handle msprojectwbs.com: mailstore1.secureserver.net and smtp.secureserver.net.

msprojectwbs.com shares the same mail server setup as other domains, for instance lanieraircompressor.com, ekindia.com, kaynehicks.com, usseenontv.com and atlsoft.com.

msprojectwbs.com shares mail servers with other domains to some extent, for instance willi-manilli.de.

Host names with three IPs:

mailstore1.secureserver.net points to 216.69.141.78, 216.69.141.114 and 216.69.141.162.

smtp.secureserver.net points to 216.69.141.71, 216.69.141.84 and 216.69.141.113.