jimsprojects.com - robtex.com
jimsprojects.com
| DNSSEC | โ ๏ธ Not signed | ||||||
| A | 27.124.125.173๐ฆ๐บ DREAMSCAPE-AS-AP27.124.125.0/24 Dreamscape Networks PTY LTD Suite 4.07 247 Coward Street | ||||||
| PTR | parked.ds.network | ||||||
| NS | ns1.cheapdomains.com.au โญ | ||||||
| A | 2a00:fd80:aaaa:ffff::eeee:b1๐ฆ๐ช DREAMSCAPE-AS-AP2a00:fd80:aaaa::/48 AS38719 IPv6 Anycast Prefix | ||||||
| PTR | ns1.cheapdomains.com.au | ||||||
| A | 27.124.125.11๐ฆ๐บ DREAMSCAPE-AS-AP27.124.125.0/24 Dreamscape Networks PTY LTD Suite 4.07 247 Coward Street | ||||||
| PTR | ns1.cheapdomains.com.au | ||||||
| NS | ns2.cheapdomains.com.au | ||||||
| A | 2a00:fd80:aaaa:ffff::eeee:b2๐ฆ๐ช DREAMSCAPE-AS-AP2a00:fd80:aaaa::/48 AS38719 IPv6 Anycast Prefix | ||||||
| PTR | ns2.cheapdomains.com.au | ||||||
| A | 27.124.125.12๐ฆ๐บ DREAMSCAPE-AS-AP27.124.125.0/24 Dreamscape Networks PTY LTD Suite 4.07 247 Coward Street | ||||||
| PTR | ns2.cheapdomains.com.au | ||||||
| SOA | ns1.cheapdomains.com.auadmin@syrahost.com serial=1674816684 | ||||||
com
| DNSSEC | ๐ Signed (DS record present) | ||||||
| NS | a.gtld-servers.net โญ | ||||||
| NS | b.gtld-servers.net | ||||||
| NS | c.gtld-servers.net | ||||||
| NS | d.gtld-servers.net | ||||||
| NS | e.gtld-servers.net | ||||||
| NS | f.gtld-servers.net | ||||||
| NS | g.gtld-servers.net | ||||||
| NS | h.gtld-servers.net | ||||||
| NS | i.gtld-servers.net | ||||||
| NS | j.gtld-servers.net | ||||||
| NS | k.gtld-servers.net | ||||||
| NS | l.gtld-servers.net | ||||||
| NS | m.gtld-servers.net | ||||||
| SOA | a.gtld-servers.netnstld@verisign-grs.com serial=1771291435 | ||||||
Same first word
jimsprojects.com |
DNS History
4 records (3 active, 1 former)
โNSns1.cheapdomains.com.au2017-02-12 โ 2026-03-22 ยท 2 obs
โ 2026-03-22 13:23:12
โNSns2.cheapdomains.com.au2017-02-12 โ 2026-03-22 ยท 2 obs
โ 2026-03-22 13:23:12
โA203.170.80.2522017-02-12 โ 2018-11-30 ยท 4 obs
โ 2018-11-30 14:22:04
โ 2026-03-09 00:05:04
โ 2026-03-22 13:23:12
โA27.124.125.1732026-03-09 โ 2026-03-22 ยท 3 obs
โ 2026-03-09 00:05:04
โ 2026-03-22 13:23:12
๐ DNS Trace
๐ Delegation Chain
| Zone | Nameservers | Glue |
|---|---|---|
| com | i.gtld-servers.net, g.gtld-servers.net, e.gtld-servers.net, b.gtld-servers.net... | - |
| jimsprojects.com | ns1.cheapdomains.com.au, ns2.cheapdomains.com.au | - |
โ Authoritative Response
Server: 27.124.125.11
NS records: ns1.cheapdomains.com.au, ns2.cheapdomains.com.au
๐ DNSSEC Status
โ ๏ธ Insecure (no DNSSEC)
No DS record for jimsprojects.com (unsigned zone)
โฑ๏ธ Timing
Total: 2141ms | Queries: -
๐ Records
| Type | Count | Sample Data |
|---|---|---|
| A | 1 | 27.124.125.173 |
| NS | 2 | ns2.cheapdomains.com.au, ns1.cheapdomains.com.au |
| SOA | 1 | ns1.cheapdomains.com.au admin.syrahost.c |
Analysis
IP Addresses
jimsprojects.com points to an IP address: 27.124.125.173.
other host names include unitalent.com.au, unitalent.co.nz, lhrmarine.co.uk, govtjobs.co.nz and danceitup.com.au; they share IP numbers with jimsprojects.com.
Name Servers
Two name servers ns1.cheapdomains.com.au and ns2.cheapdomains.com.au handle the delegation for jimsprojects.com.
jimsprojects.com shares the same name server setup as other domains, for instance hldy.co, urbanpayments.com, biosense.net.au, dreamcreativemanagement.com and warehousewine.com.au.
jimsprojects.com at least partially shares name servers with other domains, for instance microtone.com.au, whitecardcourses.com, amirasanki.com, okta.net.au and gowhalewatching.com.au.
These name servers are commonly used with the following: ns1.crazydomains.com, ns2.crazydomains.com, ns1.secureparkme.com and ns2.secureparkme.com.
Host names with two IP numbers:
ns1.cheapdomains.com.au points to 2a00:fd80:aaaa:ffff::eeee:b1 and 27.124.125.11.
ns2.cheapdomains.com.au points to 2a00:fd80:aaaa:ffff::eeee:b2 and 27.124.125.12.