dmsproject.com - robtex.com
dmsproject.com
| DNSSEC | โ ๏ธ Not signed | ||||||
| A | 192.0.78.24๐บ๐ธ Automattic192.0.78.0/24 Route Object | ||||||
| A | 192.0.78.25๐บ๐ธ Automattic192.0.78.0/24 Route Object | ||||||
| NS | ns1.wordpress.com โญ | ||||||
| A | 2a04:fa87:ffff::c6b5:7409๐ฎ๐ช Automattic2a04:fa87:ffff::/48 | ||||||
| PTR | ns1.wordpress.com | ||||||
| A | 198.181.116.9๐บ๐ธ Automattic198.181.116.0/24 Route Object | ||||||
| PTR | ns1.wordpress.com | ||||||
| NS | ns2.wordpress.com | ||||||
| A | 2a04:fa87:ffff::c6b5:7509๐ฎ๐ช Automattic2a04:fa87:ffff::/48 | ||||||
| PTR | ns2.wordpress.com | ||||||
| A | 198.181.117.9๐บ๐ธ Automattic198.181.117.0/24 Route Object | ||||||
| PTR | ns2.wordpress.com | ||||||
| NS | ns3.wordpress.com | ||||||
| A | 2620:115:c00f::c000:4a09๐บ๐ธ Automattic2620:115:c00f::/48 Route6 Object | ||||||
| PTR | ns3.wordpress.com | ||||||
| A | 192.0.74.9๐บ๐ธ Automattic192.0.74.0/24 Route Object | ||||||
| PTR | ns3.wordpress.com | ||||||
| MX | smtp-fwd.wordpress.com โญ | ||||||
| A | 192.0.82.251๐บ๐ธ Automattic192.0.82.0/24 Route Object | ||||||
| PTR | smtp1-fwd.dfw.wordpress.com | ||||||
| SOA | ns1.wordpress.comhostmaster@wordpress.com 2005-07-18 #58 | ||||||
com
| DNSSEC | ๐ Signed (DS record present) | ||||||
| NS | a.gtld-servers.net โญ | ||||||
| NS | b.gtld-servers.net | ||||||
| NS | c.gtld-servers.net | ||||||
| NS | d.gtld-servers.net | ||||||
| NS | e.gtld-servers.net | ||||||
| NS | f.gtld-servers.net | ||||||
| NS | g.gtld-servers.net | ||||||
| NS | h.gtld-servers.net | ||||||
| NS | i.gtld-servers.net | ||||||
| NS | j.gtld-servers.net | ||||||
| NS | k.gtld-servers.net | ||||||
| NS | l.gtld-servers.net | ||||||
| NS | m.gtld-servers.net | ||||||
| SOA | a.gtld-servers.netnstld@verisign-grs.com serial=1776240757 | ||||||
Same first word
dmsproject.com |
Similar names
DNS History
6 records (6 active, 0 former)
โNSns1.wordpress.com2015-07-13 โ 2026-04-15 ยท 2 obs
โ 2026-04-15 08:18:20
โNSns2.wordpress.com2015-07-13 โ 2026-04-15 ยท 2 obs
โ 2026-04-15 08:18:20
โNSns3.wordpress.com2015-07-13 โ 2026-04-15 ยท 2 obs
โ 2026-04-15 08:18:20
โMXsmtp-fwd.wordpress.com2015-07-13 โ 2026-04-15 ยท 2 obs
โ 2026-04-15 08:18:20
โA192.0.78.242015-07-13 โ 2026-04-15 ยท 2 obs
โ 2026-04-15 08:18:20
โA192.0.78.252015-07-13 โ 2026-04-15 ยท 2 obs
โ 2026-04-15 08:18:20
๐ DNS Trace
๐ Delegation Chain
| Zone | Nameservers | Glue |
|---|---|---|
| com | a.gtld-servers.net, b.gtld-servers.net, c.gtld-servers.net, d.gtld-servers.net... | - |
| dmsproject.com | ns1.wordpress.com, ns2.wordpress.com, ns3.wordpress.com | 6 records |
โ Authoritative Response
Server:192.0.74.9
NS records: ns1.wordpress.com, ns2.wordpress.com, ns3.wordpress.com
๐ DNSSEC Status
โ ๏ธ Insecure (no DNSSEC)
No DS record for dmsproject.com (unsigned zone)
โฑ๏ธ Timing
Total: 95ms | Queries: -
๐ Records
| Type | Count | Sample Data |
|---|---|---|
| A | 2 | 192.0.78.24, 192.0.78.25 |
| NS | 3 | ns2.wordpress.com, ns3.wordpress.com... |
| MX | 1 | smtp-fwd.wordpress.com (pri: 0) |
| SOA | 1 | ns1.wordpress.com hostmaster.wordpress.c |
๐ Glue Records Collected
Total: 6
Out-of-bailiwick: 6 (ns1.wordpress.com, ns1.wordpress.com, ns2.wordpress.com...)
Analysis
IP Addresses
dmsproject.com points to two IP numbers: 192.0.78.24 and 192.0.78.25.
Other host names, for instance urzasenergy.com, alittlebbq.com, pctmap.net, arteliro.com and urbanartsinc.com share IP numbers with dmsproject.com.
Name Servers
The delegation for dmsproject.com is handled by three name servers: ns1.wordpress.com, ns2.wordpress.com and ns3.wordpress.com.
dmsproject.com at least partially shares name servers with other domains, for instance sistersof.com, innover.es, cantopipes.com, navaldockyards.org and paulagerber.com.
Two IP numbers per host:
ns1.wordpress.com points to 2a04:fa87:ffff::c6b5:7409 and 198.181.116.9.
ns2.wordpress.com points to 2a04:fa87:ffff::c6b5:7509 and 198.181.117.9.
ns3.wordpress.com points to 2620:115:c00f::c000:4a09 and 192.0.74.9.
Mail Servers
dmsproject.com is handled by a single mail server, smtp-fwd.wordpress.com.
dmsproject.com uses the same mail server configuration as other domains, such as white-buffalo-gallery.com, observatoiredumensonge.com, naturalbodybuilder.com, beholdt.com and luv-yourself.com.
dmsproject.com shares mail servers with other domains at least in part, for instance kpj3.com, onewomansego.com, artes-uk.org, manfred.com.au and e4a-net.org.
smtp-fwd.wordpress.com points to a single IP: 192.0.82.251.