critical-paths.com - robtex.com
critical-paths.com
| DNSSEC | β οΈ Not signed | ||||||
| A | 13.248.243.5πΊπΈ Amazon13.248.240.0/20 | ||||||
| PTR | a16e665f42988324c.awsglobalaccelerator.com | ||||||
| A | 76.223.105.230πΊπΈ Amazon76.223.96.0/20 | ||||||
| NS | ns53.domaincontrol.com β | ||||||
| A | 2603:5:21a2::1bπΊπΈ GODADDY-DNS2603:5:21a0::/44 | ||||||
| PTR | ns53.domaincontrol.com | ||||||
| A | 97.74.106.27πΊπΈ GODADDY-DNS97.74.106.0/23 | ||||||
| PTR | ns53.domaincontrol.com | ||||||
| NS | ns54.domaincontrol.com | ||||||
| A | 2603:5:22a2::1bπΊπΈ GODADDY-DNS2603:5:22a0::/44 | ||||||
| PTR | ns54.domaincontrol.com | ||||||
| A | 173.201.74.27πΊπΈ GODADDY-DNS173.201.74.0/23 | ||||||
| PTR | ns54.domaincontrol.com | ||||||
| SOA | ns53.domaincontrol.comdns@jomax.net 2024-04-16 #1 | ||||||
com
| DNSSEC | π Signed (DS record present) | ||||||
| NS | a.gtld-servers.net β | ||||||
| NS | b.gtld-servers.net | ||||||
| NS | c.gtld-servers.net | ||||||
| NS | d.gtld-servers.net | ||||||
| NS | e.gtld-servers.net | ||||||
| NS | f.gtld-servers.net | ||||||
| NS | g.gtld-servers.net | ||||||
| NS | h.gtld-servers.net | ||||||
| NS | i.gtld-servers.net | ||||||
| NS | j.gtld-servers.net | ||||||
| NS | k.gtld-servers.net | ||||||
| NS | l.gtld-servers.net | ||||||
| NS | m.gtld-servers.net | ||||||
| SOA | a.gtld-servers.netnstld@verisign-grs.com serial=1776045702 | ||||||
Same first word
critical-paths.com |
Similar names
DNS History
4 records (4 active, 0 former)
βNSns53.domaincontrol.com2026-04-04 β 2026-04-13 Β· 2 obs
β 2026-04-13 02:11:50
βNSns54.domaincontrol.com2026-04-04 β 2026-04-13 Β· 2 obs
β 2026-04-13 02:11:50
βA13.248.243.52026-04-04 β 2026-04-13 Β· 2 obs
β 2026-04-13 02:11:50
βA76.223.105.2302026-04-04 β 2026-04-13 Β· 2 obs
β 2026-04-13 02:11:50
π DNS Trace
π Delegation Chain
| Zone | Nameservers | Glue |
|---|---|---|
| com | a.gtld-servers.net, b.gtld-servers.net, c.gtld-servers.net, d.gtld-servers.net... | - |
| critical-paths.com | ns53.domaincontrol.com, ns54.domaincontrol.com | 4 records |
β Authoritative Response
Server:173.201.74.27
NS records: ns53.domaincontrol.com, ns54.domaincontrol.com
π DNSSEC Status
β οΈ Insecure (no DNSSEC)
No DS record for critical-paths.com (unsigned zone)
β±οΈ Timing
Total: 206ms | Queries: -
π Records
| Type | Count | Sample Data |
|---|---|---|
| A | 2 | 76.223.105.230, 13.248.243.5 |
| NS | 2 | ns53.domaincontrol.com, ns54.domaincontrol.com |
| SOA | 1 | ns53.domaincontrol.com dns.jomax.net |
π Glue Records Collected
Total: 4
Out-of-bailiwick: 4 (ns53.domaincontrol.com, ns53.domaincontrol.com, ns54.domaincontrol.com...)
Analysis
IP Addresses
critical-paths.com resolves to two IP numbers: 13.248.243.5 and 76.223.105.230.
other host names including midwifeforendoflife.com, entrancemission.org, liveyourlifenow.co.uk, outmailevolution.com and maniotis.com share IP numbers with critical-paths.com.
Name Servers
critical-paths.com is delegated to two name servers ns53.domaincontrol.com and ns54.domaincontrol.com.
critical-paths.com shares the same name server setup as other domains, for instance svdanceclub.com, 4femmes.com, mim-i.com, juliavalenza.com and lifdup.com.
Host names with two IP numbers:
The host name ns53.domaincontrol.com points to 2603:5:21a2::1b and 97.74.106.27; the host name ns54.domaincontrol.com points to 2603:5:22a2::1b and 173.201.74.27.