construction-scheduling-services.com - robtex.com
construction-scheduling-services.com
| DNSSEC | โ ๏ธ Not signed | ||||||
| NS | ns1.verifymywhois.com โ ๏ธ Not in zone NS records | ||||||
| A | 209.235.147.130๐จ๐ฆ INFB209.235.144.0/20 619A Kumpf Drive Waterloo ON N2V 1K8 Canada | ||||||
| PTR | ns1.verifymywhois.com | ||||||
| NS | ns2.verifymywhois.com โ ๏ธ Not in zone NS records | ||||||
| A | 209.235.147.131๐จ๐ฆ INFB209.235.144.0/20 619A Kumpf Drive Waterloo ON N2V 1K8 Canada | ||||||
| PTR | ns2.verifymywhois.com | ||||||
com
| DNSSEC | ๐ Signed (DS record present) | ||||||
| NS | a.gtld-servers.net โญ | ||||||
| NS | b.gtld-servers.net | ||||||
| NS | c.gtld-servers.net | ||||||
| NS | d.gtld-servers.net | ||||||
| NS | e.gtld-servers.net | ||||||
| NS | f.gtld-servers.net | ||||||
| NS | g.gtld-servers.net | ||||||
| NS | h.gtld-servers.net | ||||||
| NS | i.gtld-servers.net | ||||||
| NS | j.gtld-servers.net | ||||||
| NS | k.gtld-servers.net | ||||||
| NS | l.gtld-servers.net | ||||||
| NS | m.gtld-servers.net | ||||||
| SOA | a.gtld-servers.netnstld@verisign-grs.com serial=1785257072 | ||||||
Same first word
construction-scheduling-services.com |
DNS History
5 records (2 active, 3 former)
โNS64.29.151.2092026-06-29 โ 2026-07-28 ยท 2 obs
โ 2026-06-29 00:15:20
โ 2026-07-28 17:01:22
โ 2026-07-28 17:01:22
โNSns1.verifymywhois.com2026-06-29 โ 2026-07-28 ยท 2 obs
โ 2026-06-29 00:15:20
โ 2026-07-28 17:01:22
โ 2026-07-28 17:01:22
โNSns2.verifymywhois.com2026-06-29 โ 2026-07-28 ยท 2 obs
โ 2026-06-29 00:15:20
โ 2026-07-28 17:01:22
โ 2026-07-28 17:01:22
โA64.29.151.2092026-06-29 โ 2026-07-28 ยท 2 obs
โ 2026-06-29 00:15:20
โ 2026-07-28 17:01:22
โ 2026-07-28 17:01:22
โCNAME64.29.151.2092026-06-29 โ 2026-07-28 ยท 2 obs
โ 2026-06-29 00:15:20
โ 2026-07-28 17:01:22
โ 2026-07-28 17:01:22
๐ DNS Trace
Analysis
Name Servers
construction-scheduling-services.com is served by two delegated name servers, ns1.verifymywhois.com and ns2.verifymywhois.com.
construction-scheduling-services.com shares its name server setup with other domains, including nickoza.com, apcolleges.net, sparkplugflash.com and two others.
ns1.verifymywhois.com resolves to 209.235.147.130. ns2.verifymywhois.com resolves to 209.235.147.131. Both host names point to a single IP number.