commsprojects.com - robtex.com
commsprojects.com
com
| DNSSEC | ๐ Signed (DS record present) | ||||||
| NS | a.gtld-servers.net โญ | ||||||
| NS | b.gtld-servers.net | ||||||
| NS | c.gtld-servers.net | ||||||
| NS | d.gtld-servers.net | ||||||
| NS | e.gtld-servers.net | ||||||
| NS | f.gtld-servers.net | ||||||
| NS | g.gtld-servers.net | ||||||
| NS | h.gtld-servers.net | ||||||
| NS | i.gtld-servers.net | ||||||
| NS | j.gtld-servers.net | ||||||
| NS | k.gtld-servers.net | ||||||
| NS | l.gtld-servers.net | ||||||
| NS | m.gtld-servers.net | ||||||
| SOA | a.gtld-servers.netnstld@verisign-grs.com serial=1794402666 | ||||||
Same first word
commsprojects.com |
commsprojects.pages.dev |
Previous names
Next names
DNS History
8 records (8 active, 0 former)
โNSdns1.nominalia.com2015-06-26 โ 2026-11-11 ยท 2 obs
โ 2026-11-11 13:43:02
โNSdns2.nominalia.com2015-06-26 โ 2026-11-11 ยท 2 obs
โ 2026-11-11 13:43:02
โMXalt1.aspmx.l.google.com2015-06-26 โ 2026-11-11 ยท 2 obs
โ 2026-11-11 13:43:02
โMXalt2.aspmx.l.google.com2015-06-26 โ 2026-11-11 ยท 2 obs
โ 2026-11-11 13:43:02
โMXalt3.aspmx.l.google.com2015-06-26 โ 2026-11-11 ยท 2 obs
โ 2026-11-11 13:43:02
โMXalt4.aspmx.l.google.com2015-06-26 โ 2026-11-11 ยท 2 obs
โ 2026-11-11 13:43:02
โMXaspmx.l.google.com2015-06-26 โ 2026-11-11 ยท 2 obs
โ 2026-11-11 13:43:02
โA81.88.53.1582026-09-07 โ 2026-11-11 ยท 2 obs
โ 2026-11-11 13:43:02
๐ DNS Trace
๐ Delegation Chain
| Zone | Nameservers | Glue |
|---|---|---|
| com | a.gtld-servers.net, b.gtld-servers.net, c.gtld-servers.net, d.gtld-servers.net... | - |
| commsprojects.com | dns1.nominalia.com, dns2.nominalia.com | 2 records |
โ Authoritative Response
Server:81.88.63.48
NS records: dns1.nominalia.com, dns2.nominalia.com
๐ DNSSEC Status
โ ๏ธ Insecure (no DNSSEC)
No DS record for commsprojects.com (unsigned zone)
โฑ๏ธ Timing
Total: 1376ms | Queries: -
๐ Records
| Type | Count | Sample Data |
|---|---|---|
| A | 1 | 81.88.53.158 |
| NS | 2 | dns1.nominalia.com, dns2.nominalia.com |
| MX | 5 | aspmx.l.google.com (pri: 10), alt1.aspmx.l.google.com (pri: 20)... |
| SOA | 1 | dns1.nominalia.com root.dns1.nominalia.c |
๐ Glue Records Collected
Total: 2
Out-of-bailiwick: 2 (dns1.nominalia.com, dns2.nominalia.com)
Analysis
IP Addresses
commsprojects.com resolves to one IP address: 81.88.53.158.
aerotermia.me, celiamonton.com, obresdepais.cat and two other host names share IP numbers with commsprojects.com.
Name Servers
commsprojects.com has two authoritative name servers โ dns1.nominalia.com and dns2.nominalia.com.
commsprojects.com uses the same name servers as several other domains โ among them odontoserveis.es, giljuridic.com, jordigrau.online and two more.
The name servers for commsprojects.com overlap at least partially with those of other domains โ for example calvosobrino.es.
Hostnames that resolve to two IP addresses:
dns1.nominalia.com resolves to 81.88.61.3 and 2a01:8100:2911::2:184:3.
Hosts with just one IP address:
dns2.nominalia.com resolves to 81.88.63.48.
Mail Servers
Mail for commsprojects.com is handled by five mail servers, namely aspmx.l.google.com, alt1.aspmx.l.google.com, alt2.aspmx.l.google.com and two others.
commsprojects.com has at least partial mail server overlap with other domains such as thebirdsperspective.com, laceos.com, pureassistedgrowth.com and two more.
These mail servers are often used together with the mail servers alt3.aspmx.l.google.com, alt4.aspmx.l.google.com, aspmx2.googlemail.com and aspmx3.googlemail.com.
Hostnames that resolve to two IP addresses:
aspmx.l.google.com resolves to 142.251.179.26 and 2607:f8b0:4004:c27::1a.
alt1.aspmx.l.google.com resolves to 192.178.234.27 and 2800:3f0:4003:c14::1b.
alt2.aspmx.l.google.com resolves to 172.253.116.27 and 2a00:1450:400b:c02::1a.
alt3.aspmx.l.google.com resolves to 192.178.223.27 and 2a00:1450:4009:c0f::1a.
alt4.aspmx.l.google.com resolves to 172.253.157.26 and 2a00:1450:400c:c23::1a.